Oct 28, 2026
The sub-20 mg/Nm³ NOx emission level achieved at GGZ Zschopau’s district heating plant in Germany in late 2024 was not merely a single test run result. Since the commissioning, Oilon’s new-generation LN30 burner has demonstrated its reliability in continuous daily...
Oct 28, 2026
In late February 2026, plant engineering specialist KOLB delivered a comprehensive system solution to a pet food manufacturing facility in Dornburg, with Oilon’s ACE2 hot air burner (GT-6A2) playing a key role in the installation. The initial emission...
May 20, 2026
The Warsan Energy from Waste facility has been constructed and is Operated by the Warsan Waste Management Company (WWMC), under the 35 year Concession Agreement with Dubai Municipality, through a public-private partnership (PPP). The facility processes...
May 20, 2026
Nationwide Boiler Inc. has successfully completed a boiler project for a leading food producer in California, meeting critical steam capacity needs and strict emissions performance standards. The system passed formal compliance source testing with outstanding results,...
Oct 28, 2024
Oilon is delivering 20 low NOx burners to a massive district heating project in Astana, the capital of Kazakhstan. Two large district heating plants with a heating power of 700 MW each will be serving new advanced residential areas of Astana, called Telmana and Turan....